Kishorn Dry Dock
An intresting job undertaken for kishon port ltd at the newly revamped kishorn dry dock which included formation of a new concrete headwall/dam to catch surplus water and carry it down a newly formed pipeline to an outfall at sea level to reduce and minimise excess water from a hill stream behind the dam reaching the floor of the dry dock.





